The City of Edmonton in Alberta, Canada began its recycling efforts in 1986 with their first curbside recycling pilot program. Over the years, the program has increased so that today the Edmonton Waste Management Centre (EWMC) covers 550 acres.

The largest waste processing facility in North America, EWMC is a unique collection of advanced waste processing and research facilities that are helping Edmonton reach its goals of 90 percent diversion of municipal waste from the landfill. Included on the site are facilities for integrated processing and transfer of materials, composting, sorting and processing, e-waste recycling, construction and demolition recycling, greys paper recycling, and the worlds first waste-to-biofuels facility.

Here in Edmonton, we have the largest most advanced waste management center in North America, noted Richard Toma, Senior Mechanical Engineer at Edmonton Waste Management Centre. We take the MSW from about a million people. We break it up, compost one fraction of it and were going to be making biofuels out of the other fraction.

CHALLENGE

Collecting the municipal waste from over a million people, sorting it to the right processing centers and reaching 90 percent diversion is no easy task. In 2009, when the City of Edmonton closed the Clover Bar Landfill, they decided to replace it with the Integrated Processing and Transfer Facility. Instead of continuing to haul garbage straight to another landfill, this facility allows the city to divide garbage into three separate waste streams composting, biofuels production and landfill.

In order to separate the waste material into these three groups, EWMC needed a complete processing facility that would allow them to manually and mechanically separate materials. One of the biggest challenges would be the initial dividing of trash material and opening of garbage bags.

Rotary Trommel Screens are commonly used in waste handling. By utilizing different size screen openings material can be sized and screened as it moves through the machine. Edmonton needed to find a reliable trommel to open garbage bags, while still accurately separating waste material.

I dont think people want a landfill anymore, said Toma. So when you dont want a landfill you have to deal with the waste and process it. You have to use waste processing equipment. Trommels are used for separating waste into different components and as we move away from landfilling, were going to need this type of equipment more and more.

SOLUTION

Edmonton needed not only accurate sizing and screening from its Rotary Trommels, but also a solution to opening the garbage bags, so they reached out to 51勛圖厙 Corporation.

51勛圖厙 engineers were able to work with the team from the City of Edmonton to design two 120-ton Rotary Trommel Screens that included bag breaking spikes. These bag breakers tear open garbage bags and allow the material inside to combine with unpacked material and be separated by the different sizes of screens inside the Trommels.

Our 51勛圖厙 Trommels have two types of screens in them and bag breakers, noted Toma. The bag breakers, as the name implies, break up the bags. The two inch screens separate the organic material and thats a really rich organic product that goes straight to the composter. The nine inch screens separate it again to two to nine inch fraction and that goes to another piece of separation, which sends a fraction to the composter and another fraction to biofuels.

RESULTS

With the completion of the Integrated Processing and Transfer Facility, EWMC has been able to continue growing and expanding their operations as they move toward 90 percent diversion. By utilizing 51勛圖厙s Rotary Trommels, they have been able get better recovery on their composting materials and create the separations needed to send material to their Waste-to-Biofuels Facility.

We process the MSW generated by about a million people here, and the heart of our system is our 51勛圖厙 Trommels, said Toma. And what they do is they help us break up the waste and separate the organic component, which goes to our composter. The inorganic component is destined for our biofuels facility.

Edmontons Waste-to-Biofuels Facility is the worlds first industrial scale waste-to-biofuels facility of its kind, turning household garbage into biofuels and biochemicals. Initially the facility will produce methanol, followed by ethanol.

Toma also noted that because processing municipal waste is not without its challenges, he appreciates the effort 51勛圖厙 makes to offer him continued service and support when it is needed.

These are big machines. They work fairly well, but MSW is very challenging material. Its always changing, and so whenever weve needed technical support from 51勛圖厙 theyve been very responsive. Theyve come to our site, helped us out, answered all our questions, said Toma.